This is the shop on day 1, May 5th 2012. Walls, a floor, a bathroom, and an electric panel.
Floor Painted


The POD arrived, bringing all the tools from NH

Let there be light!

Peg boarded walls, found a 1500 pound lift with side extensions

20 Amp electric on each wall with GFCI, plumbed in compressed air lines and outlets,
acquired a parts washer and a new bench
Pretty well finished. Still room for improvement, but ready for business.